Rohrer’s Quarry – New Concrete Batch Plant, Lititz, PA

Award Winner: Award of Excellence, Associated Builders & Contractors – Keystone Chapter
Greenebaum Structures provided structural engineering design and analysis for this challenging project. The project included new reinforced concrete aggregate storage bins and tunnel, foundations for a new conveyor system, and a 10-story structure to hold new material tanks, concrete mixer, and quality control office. The base of the 10-story structure was reinforced concrete on a mat foundation, while the eight upper stories were structural steel. Horst Construction built the $3.5M facility with office design by Cornerstone Design Architects.